Infrastructure Development

Atal Bihari Vajpayee Government Institute of Engineering & Technology is spread across an area of 123.4 Bighas. The students are provided with modern infrastructure and amenities and are taught using the latest technologies to make learning more interesting and fun. Some of the infrastructural facilities include well-ventilated classrooms, girls' hostel, canteen, indoor and outdoor games, wellstocked library, internet connectivity, medical facilities, and CCTVs installed at suitable places. In addition to this, classrooms and labs are well equipped with Smart Boards, Digital Podiums, Smart TVs, Projectors and the latest Softwares.

Read More

Infrastructure Works Financial Progress

Administratively approved funds (in Cr. of Rupees) for completed and ongoing works Funds released to Execution Agencies (Cr.) Remarks
110.04 Cr.(107.44 Cr. Govt. Fund +2.60456 Cr. SWF)
  • 64.07 Cr. approved during 2011 -2022 (60% of total)
  • 45.97 Cr. in 2023 which is about 42 % of total A/A till date
57.99 Cr. Out of this, 1.6 Cr. For auditorium work and 0.3845 Cr. for sports complex have been deposited with BSNL out of SWF. 0.9 Cr. out of Govt. fund to JSV for WS Scheme. 0.53 Cr. to PWD for road repair.
  • In 2011, when institute was started, a grant of 15 Cr . rupees was received from SJVNL. Out of 15 Cr. Rupees, 4.96 Cr. was spent on building works and Remaining amount was spent on creating machinery & equipment and utility facilities.
  • Rs 8.3 Cr. Was received and spent under TEQIP-III Project
  • 0.62 Cr. Are being spent out of SWF for road repair/tiring works by PWD
  • About total 130 Cr. Worth of rupees have been approved till now

Infrastructure Financial & Physical Progress (Completed Works)

Sr. No. Name of the Building/Work Completed A/A Amount (in Cr.) Execution agency Amount deposited with Execution agency Physical Progress Remarks
Govt.Fund SWF
1 Engineering (B. Tech wing): A, B, C, D, E, F, & Vertical Extension G&H blocks including auditorium hall) 26.47 0 BSNL 26.47 100% Building inaugurated on 23-11-2023
2 96 Bedded Girls Hostel 6.28 0 BSNL 6.28 100% Building inaugurated on 27-09-2022
3 Cafeteria Block 1.6 0 BSNL 1.6 100% Building inaugurated on 09-03-2023
4 Interior work of auditorium 0 1.6 BSNL 1.6 100% Auditorium inaugurated on 23-11-2023
5 Outdoor Sports Facility (BB, VB Courts) 0 03845 BSNL 0.3645 100% August, 2024
Total 34.35 1.9845 36.3345

Infrastructure Financial & Physical Progress (Ongoing Works)

Sr.No. Name of the Building/Work Ongoing A/A Amount (in Cr.) Execution agency Amount deposited with Execution agency Balance Amount to be deposited with Execution agency Physical Progress Remarks
Govt.Fund SWF Work started in Likely DoC Others
1 ITI Wing Building 10.62 0 BSNL 6.30 4.32 75% 17.09.2021 31.03.2025 Funds Req.
2 102 Bedded Boys Hostel 8.96 0 BSNL 6.66 2.3 70% 26.04.2023 31.03.2025
3 Type-IV Residences (16 No.) 8.59 0 BSNL 6.27 2.32 70% 17.05.2023 31.03.2025
4 Polytechnic wing Building 43.99 0 BSNL 2.43 41.56 2% Nov. 2023 Funds Req.
5 M/T work of institute road from Baagipul to campus 0 0.62 HPPWD 0.5321 0.093 90% 05.03.2021
6 Water Supply Scheme for campus 0.9072 0 JSV 0.9072 0 80% 07.10.2021
Total 73.0672 0.626 23.0993 50.593

Summary Of Infrastructure Financial & Physical Progress

Amount (in Cr. of Rupees) of A/A for various construction works till date Amount (in Cr. of Rupees) of works completed till date Amount (in Cr. of Rupees) of works under going at present Amount in Cr. of rupees paid till date to various execution agencies for ongoing works Balance Amount in Cr. of rupees to be paid to various execution agencies for ongoing works
BSNL HPPWD JSV BSNL HPPWD JSV
110.04 36.34 73.7 57.99 0.5321 0.9072 50.52 0.093 0